Grizzly Peak Century Ride

  • Date Sun 3rd May 2026
  • Time 6:30AM PDT
  • Location Moraga, California
  • Price $60.00 - $100.00
  • Races 6 races
  • Distances Ultra

Event summary

Get ready for an exhilarating day of cycling at the Grizzly Peak Century Ride on Sunday, May 3, 2026, in the scenic town of Moraga, Contra Costa! This exciting event features a variety of challenging routes for cyclists of all levels, with four paved options and two thrilling gravel routes. Whether you’re up for a 30-mile ride with approximately 2,600 feet of climbing, a 50-mile challenge with around 4,200 feet of ascent, or pushing your limits on the iconic 100-mile route that boasts a staggering 8,700 feet of climbing, there's something for everyone. For gravel enthusiasts, choose between a 70K adventure with 4,200 feet of climbing or a demanding 100K route with 6,500 feet of elevation gain. Mark your calendars for this unforgettable cycling experience that promises stunning views, camaraderie, and an adrenaline rush like no other!

Organiser's Description

THERE ARE FOUR PAVED ROUTES AND TWO GRAVEL ROUTES TO CHOOSE FROM, ALL OF THEM VERY HILLY:

30 MILES (~2,600 FT OF CLIMBING)
50 MILES (~4,200 FT OF CLIMBING)
75 MILES (~5,900 FT OF CLIMBING)
100 MILES (~8,700 FT OF CLIMBING)
70K GRAVEL (~4,200 FT OF CLIMBING)
100K GRAVEL (~6,500 FT OF CLIMBING)

Races

  • 30 Miles

    Incl. T-Shirt

    Sun 3rd May 2026 (9:30AM PDT)

    $60.00

    The 30 mile course has about 2,000 feet of climbing, so it isn't easy!
  • 50 Miles

    Incl. T-Shirt

    Sun 3rd May 2026 (7:30AM PDT)

    $90.00

    The 50 mile course has about 4,400 feet of climbing. It is the heart of the 75 mile course but skips the northern portion. It offers plenty of climbing and great views. From the start at St Mary's College it climbs the east side of the Oakland-Berkeley hills via Pinehurst Road, then follows the ridge up and over Grizzly Peak and into Tilden Park to the rest stop at Island Picnic Area. It then continues on the ridge and around the north end of the Berkeley Hills to Castro Ranch Road. Then it's on to the Three Bears with a rest stop at Briones Regional Park. Finally, relatively easy riding on Moraga Way takes you back to the start for the post-ride meal.
  • 75 Miles

    Incl. T-Shirt

    Sun 3rd May 2026 (7:30AM PDT)

    $95.00

    The 75 mile (actually about 73 mile) course with about 6,200 feet of climbing is our most popular route. From the start at St Mary's College it climbs the east side of the Oakland-Berkeley hills via Pinehurst Road, then follows the ridge up and over Grizzly Peak and into Tilden Park to the rest stop at Island Picnic Area. It then heads north to the edge of the Bay and the Carquinez Strait to the rest stop at Port Costa. From there it climbs McEwen Road for a run down into Franklin Canyon and Alhambra Valley, then over Pig Farm Hill and through the hills around Briones Reservoir to the rest stop at Briones Regional Park. Finally, relatively easy riding on Moraga Way takes you back to the start for the post-ride meal.
  • 100 Miles

    Incl. T-Shirt

    Sun 3rd May 2026 (6:30AM PDT)

    $100.00

    The 100 mile course has roughly 9,000 feet of climbing. The route starts with an early morning south loop to the Ivy Park rest stop. Then it climbs the east side of the Oakland-Berkeley hills via Pinehurst Road, and follows the ridge up and over Grizzly Peak and into Tilden Park to the rest stop at Island Picnic Area. It then heads north to the edge of the Bay and the Carquinez Strait to the rest stop at Port Costa. From there it climbs McEwen Road for a run down into Franklin Canyon and Alhambra Valley, then over Pig Farm Hill and through the hills around Briones Reservoir to the rest stop at Briones Regional Park. Finally, relatively easy riding on Moraga Way takes you back to the start for the post-ride meal.
  • 70K (Gravel)

    Incl. T-Shirt

    Sun 3rd May 2026 (7:30AM PDT)

    $90.00

    The 70K gravel route explores some of the greatest hits in our wonderful East Bay Regional parks. The 70K route is identical to the 100K route without the early morning loop through Lake Chabot Park, so you should have some company on the trails. After a 4 mile paved lead-in, you'll hit the dirt to traverse Redwood Park on Eastridge Trail. Then enjoy the paved Skyline Drive and our namesake Grizzly Peak Blvd enroute to Seaview and other trails in Tilden Park. After the rest stop at Island Picnic Area you'll head down Wildcat Creek and then up and over the ridge to join the road riders for the trip back to St Mary's. The course covers about 41 miles with about 3,800 ft of elevation gain.
  • 100K (Gravel)

    Incl. T-Shirt

    Sun 3rd May 2026 (6:30AM PDT)

    $100.00

    The 100K gravel route explores some of the greatest hits in our wonderful East Bay Regional Parks. You'll start with a morning loop through Anthony Chabot Park before the first rest stop. Then traverse Redwood Park on Eastridge Trail and enjoy the paved Skyline Drive and our namesake Grizzly Peak Blvd enroute to Seaview and other trails in Tilden Park. After the rest stop at Island Picnic Area you'll head down Wildcat Creek and then up and over the ridge to join the road riders for the trip back to St Mary's. The course covers about 61 miles with about 6,000 ft of elevation gain. This route will challenge you while helping sharpen your early season fitness and affording you the beauty of the East Bay.

Reviews

Doing this event?

First-hand event reviews from people who have been there, done that and got the breathable T-shirt, really help everyone choose their next event. You'll be able to review this event once it's taken place.

Location

St. Mary's College, 1928 St. Marys Rd., Moraga, 94575, CA, United States

Who's In

See who else is doing this event

Maybe

Alex Coleman

Yvette Tavarez

Jack Hanley

Seth Strader

More from findarace.com

You might like

May 3, 2026

$60.00 - $100.00